进出口网免费注册会员登陆进口信息 | 设为主页 | 保存桌面 | 手机版 | 二维码
71

加拿大Cenovus能源公司

Cenovus Energy Inc.

石油天然气开采炼制销售

新闻中心/News
产品分类/Product
  • 暂无分类/No Category
站内搜索/Search
 
企业手机网站二维码地址
随时随地,手机浏览
您当前的位置/Your current location:首页/Home » 进口供应/Product » 石油生产项目 oil
石油生产项目 oil
点击图片查看原图
Click image to view full size image
产品: 石油生产项目 oil 
Title: Oil - producing projects 
品牌
Brand:
Cenovus
单价
Unit price:
面议
Negotiable
发货期限
Delivery date:
自买家付款之日起 3 天内发货
Since the payment date 3 Days delivery

联系人: 前台 (女士)    
电话/Tel: 1-403-7662000
电邮/Email: info@cenovus.com

  询价
详细信息/Details
福斯特小河和克里斯蒂娜湖项目
我们目前有两个使用蒸汽辅助重力泄油(SAGD)的油砂项目,福斯特溪和克里斯蒂娜湖。在福斯特小河和克里斯蒂娜湖,油位于地表以下约350至450米,需要专门的方法来钻井和开采。我们这两个项目使用的主要技术是SAGD--将蒸汽注入到储油池,将石油软化之后将其送至地面。这是我们与康菲公司合资企业的两个油砂项目。

阿尔伯塔省北部的鹈鹕湖项目
在我们百分之百拥有的鹈鹕湖项目中,我们从移动Wabiskaw岩层中提取重油,该项目距埃德蒙顿北部约300公里。自2006年以来,我们运用聚合物和注水技术优化水平钻井提高生产力。

海峡湖是我们在加拿大的第三个油砂项目
海峡湖油砂项目靠近克里斯蒂娜湖。预计将有每天13万桶的总生产能力,该项目我们分三个阶段进行,每个项目长达40年。初始阶段的基础工作于2012年秋开始,每日生产总额为45,000桶。(中国进出口网)

Our Foster Creek and Christina Lake projects
We currently have two producing steam-assisted gravity drainage (SAGD) projects in the oil sands, Foster Creek and Christina Lake. The oil at Foster Creek and Christina Lake is located about 350 to 450 metres below the surface and requires specialized methods to drill and pump the oil to the surface. The primary technology we use for these two projects is SAGD, a process which injects steam into the reservoir to soften the oil so it can be pumped to the surface. These are two of the oil sands projects in our 50/50 business venture with ConocoPhillips.

Our Pelican Lake project in northern Alberta
We produce heavy oil from the mobile Wabiskaw formation at our 100 percent-owned Pelican Lake project, about 300 kilometres north of Edmonton. Since 2006, polymer has been injected along with waterflooding technology to optimize horizontal drilling and enhance production from this reservoir.

Narrows Lake is our third project in Canada's oil sands
Narrows Lake is an oil sands project located near Christina Lake. It's expected to have a total gross production capacity of 130,000 barrels per day, three phases and a project life of up to 40 years. Ground work for the initial phase of 45,000 gross barrels per day began in the fall of 2012. 
询价单/Inquiry